Via a mix of measured term contracts, Asbestos Removal Frameworks and individual projects, we complete in excess of 20,000 asbestos abatement projects per annum, working on projects from the humble domestic garage up to large-scale complex multi-site, multi-phased projects within challenging and often hazardous live working environments.

Our experience includes working in city centre locations and within live working environments, whereby a thorough pre-works planning stage is fully inclusive of risk identification and mitgigation strategies to successfully work around logisitcs, site access, pedestrian segregation and traffic management.

As with all our clients, we are a flexible contractor and where practically possible, change our working methods, processes and procedures to help our clients achieve their end goals and objectives, minimising disruption at every opportunity. 

All projects adhere to agreed communication models between our Site Management team and client representatives, whereby we actively encourage sharing of improvement ideas, best practice and challenging the working processes and procedures. 

Large Scale, Complex Projects

We have proven and demonstrable experience of successfully mobilising, resourcing, managing and delivering large scale, complex projects to timescale and budget.

We work with numerous prestigious clients including:      

  • Kings College London

  • Skanska / Keltbray    

  • Kettering General Hospital    

  • University of Glasgow

  • University of Leeds

Skanska / Keltbray - Battersea Power Station

Battersea Power Station was decommissioned in 1983 and given Grade II building status. The central London site redevelopment project was part of a seven phased, £8 Billion project to redevelop the site into apartments and a retail centre. Following appointment of the works to Keltbray Ltd by the main contractor Skanska, we were instructed to work in partnership with Keltbray, completing sequential stages throughout the multi-level/area site.

 

Key Components

  • Working seamlessly around additional trades, to strict working timescales

  • Due to no site parking permitted, plant/equipment delivered to site in advance

  • Licensed works meticulously planned using a sequentially phased working programme

  • Decontamination works predominantly included removal of pipe insulation, heavy concrete ceiling panels (200 x ¼ tonnes), gross clean of heavily rusted steelwork and flaking paint to walls, all within Turbine Halls A and B of approximate size c300m x 30m x 45m high

  • Alternative working methods deployed whilst working around heritage issues

  • Aspect Site Supervisor received Skanska accolade for outstanding works

Kings College London – Bush House

We are a preferred supplier for Kings College London as part of their Asbestos Removals Framework, having recently ranked as 1st placed LARC following a competitive tender exercise. We work across their portfolio of 74 buildings where they are the duty holder, including listed buildings, working on several prestigious city centre large-scale individual projects.  Kings College London form part of King’s Health Partners, one of only six Academic Health Science Centres (AHSCs) in England designated by the Department of Health, operating as a specialist world-leading research led University. The most recently completed large-scale project was at Bush House, Strand Campus.

Key Components

  • Centrally located, prestigious campus in London; densely populated live working environment including students, staff, visitors and 3rd parties

  • Works involved decontamination of floor voids to 11 levels to North East Wing; installation of fire rated baffles to top and base of perimeter walling to seal residual contamination within cavities

  • Project delivered ahead of timescales and exceeded client expectations

University of Sheffield – Bartolome House

The University comprises of +200 buildings, including several with Grade II listed status where we have successfully completed large scale, complex asbestos removal projects. Our experience predominantly has involved asbestos removal within duct/riser networks, Plant and Boiler Rooms, classrooms and Student Union areas. We utilise site-specific working methods including quill blasting performed by suitably qualified and experienced operational teams. Projects are archetypally extremely time precious, working around term times and live occupancy to demanding and challenging specifications.

 Key Components

  • Working as Principal Contractor, Aspect Contracts project managed all works within the Grade II listed Bartolome House, undertaking full management and coordination of all subcontractors 

  • Works involved removal of 280m2 of thermal insulation residues to walls and 70 lineal metres of thermal insulation residues to pipework throughout the Plant Rooms

  • Coordination of mechanical and electrical isolations prior to works commencing

 

 

 

HS2 (High Speed 2)

HS2 is one of the most demanding and exciting transport projects in Europe, providing a high-speed rail link that will connect major cities through the spine of the UK. Costain and Skanska have come together to form a Joint Venture to deliver the works, with Aspect Contracts delivering pre-demolition specialist asbestos removal from the Thistle Hotel within the iconic Euston Station area in Central London. 

 

 

Key Components

  • Removal of all sprayed coatings to the ceiling of the basement area followed by removal of strategically located non-structural walls

  • Removal of all residues from remaining walls and ceiling using quill blasting technique

  • Removal of all mechanical and electrical services throughout

  • Licensed works under fully controlled conditions, completed whilst adhering to extremely tight client timelines 

Find Us

Aspect Contracts Ltd, Beza Road, Leeds, West Yorkshire, LS10 2BR
(0)113 271 1346

Find Us

Aspect Contracts Ltd, Aspect House, Honywood Road, Basildon, Essex, SS14 3DS
(0)1268 534477

Find Us

Aspect Contracts Ltd, 95 Carron Place, East Kilbride, Glasgow, G75 0YL
(0)1355 574901
  • Construction Online
  • Safe Contractor
  • SAAS
  • Achilles UVDB
  • CITB
  • Arca Gold Training 2021
  • Sustainability School
  • SMAS
  • Builders Conference
  • Arca Gold Site 2022
  • Arca
  • Builder Profile
  • Chas